Metro

Kochi Metro — Viaduct & Track Proof Check

For Kochi Metro Rail Limited (KMRL), Étude proof-checked the ballastless track and elevated viaduct, working for contractor KEC International. The review confirmed the structural and track design ahead of construction on the elevated corridor.

Scope

  • Proof-checking of the elevated viaduct superstructure.
  • Verification of ballastless track design.
  • Independent review against governing standards.

Start a conversation

We choose our projects as carefully as we engineer them.

We take on work where our judgement makes the difference. If yours is the right fit, we'd like to hear about it.

Get in touch