For the World Bank, Étude prepared the Detailed Project Report for rehabilitating Ghana’s 320 km Accra–Kumasi Eastern Line, together with an inland port at Bonkra. The programme restores a strategic freight and passenger corridor in West Africa.
Scope
- Detailed Project Report for the 320 km Eastern Line rehabilitation.
- Engineering for the associated inland port at Bonkra.
- Delivery to World Bank standards for an international rail corridor.