International Railway

Eastern Line Rehabilitation, Ghana

For the World Bank, Étude prepared the Detailed Project Report for rehabilitating Ghana’s 320 km Accra–Kumasi Eastern Line, together with an inland port at Bonkra. The programme restores a strategic freight and passenger corridor in West Africa.

Scope

  • Detailed Project Report for the 320 km Eastern Line rehabilitation.
  • Engineering for the associated inland port at Bonkra.
  • Delivery to World Bank standards for an international rail corridor.